Volume- 10
Issue- 4
Year- 2022
DOI: 10.55524/ijircst.2022.10.4.7 |
DOI URL: https://doi.org/10.55524/ijircst.2022.10.4.7
Crossref
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0) (http://creativecommons.org/licenses/by/4.0)
Article Tools: Print the Abstract | Indexing metadata | How to cite item | Email this article | Post a Comment
Sheikh Adil Habib , Dharminder Kumar
Nuclear plants' rewards and prices, etc and severe negative costs, are determined by their technology and the amount of electricity they create. Most nations, especially emerging ones where electricity output is expected to grow significantly, do not disclose plant-level generating statistics. The Global Power Plant Database uses this technical information to estimate the yearly energy generation of power plants. For several forms of fuels, including airflow, renewables, freshwater (hydro), as well as gas power generation, we employ different estimating models. Statistical regression and machine learning techniques are used in the process. Predictive factors include foliar data like as seed size and fuel type, as well as state characteristics also including total GDP per megawatt of installed capacity. We indicate that fossil modelling would provide more high accuracy for wind, renewable power, and hydropower is produced. Natural gas plant estimates are also improving, although the margin of error remains considerable, especially for smaller facilities.
M. Tech Scholar, Department of Electrical Engineering, RIMT University, Mandi Gobingarh, Punjab, India
No. of Downloads: 25 | No. of Views: 539
Fadhillah Azmi, Amir Saleh, Achmad Ridwan.
January 2023 - Vol 11, Issue 1
Mohammad Irfan Lone.
November 2022 - Vol 10, Issue 6
Mudasir Ahmad Wani, Er. Dharminder Kumar, Dr Satish Saini.
September 2022 - Vol 10, Issue 5